ITAC Assessment: ND0224
ITAC logo
ITAC Assessment: ND0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Popcorn
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 300,000
ft2
Annual Production 200,000,000
lb
Production Hrs. Annual 7,008
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $495,207 8,398,593
kWh
Natural Gas $46,021 10,052
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,376 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,075

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $14,560 $38,000 $14,560
250,293
kWh
02 2.7135: Install occupancy sensors $3,594 $2,000 $3,594
69,168
kWh
03 2.3212: Optimize plant power factor $1,900 $3,105 $1,900
-
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,300 $240 $1,300
25,205
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $807 $478 $807
15,533
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $215 $1,090 $215
4,103
kWh
TOTAL RECOMMENDED $22,376 $44,913 $22,376
364,302
kWh
TOTAL IMPLEMENTED $16,075 $39,330 $16,075
279,601
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs