| Assessment Year | 1994 |
|---|---|
| Principal Product | cheese |
| NAICS |
n/a
|
| SIC | 2022: Natural, Processed, and Imitation Cheese |
| Sales Range | $50 M to 100M |
| # of Employees | 230 |
| Plant Area |
160,000
ft2
|
| Annual Production | 50,000,000
lb
|
| Production Hrs. Annual | 6,656
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $165,596 | 7,437,280 |
kWh
|
$0.022 |
| Natural Gas | $127,283 | 33,550 |
MMBtu
|
$3.79 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $53,786 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $11,000 | $11,920 |
$11,000
240,914
kWh
|
- | |
| 02 | 2.1213: Direct warmest air to combustion intake | $1,112 | $1,500 | - |
$1,112
-
MMBtu
|
|
| 03 | 2.7135: Install occupancy sensors | $5,177 | $900 |
$5,177
113,423
kWh
|
- | |
| 04 | 2.6218: Turn off equipment when not in use | $122 | $910 |
$122
2,638
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,273 | $1,568 |
$3,273
71,805
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $290 | $775 |
$290
6,448
kWh
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,431 | $1,350 |
$13,431
294,256
kWh
|
- | |
| 08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,979 | $5,000 |
$2,979
-
kWh
|
- | |
| 09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $16,402 | $5,000 | - |
$16,402
-
MMBtu
|
|
| TOTAL RECOMMENDED | $53,786 | $28,923 |
$36,272
729,484
kWh
|
$17,514
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs