ITAC Assessment: ND0193
ITAC logo
ITAC Assessment: ND0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product kitchen cabinets
NAICS
n/a
SIC 2434: Wood Kitchen Cabinets
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 300,000
ft2
Annual Production 400,000
pieces
Production Hrs. Annual 4,575
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $387,482 8,131,594
kWh
Natural Gas $98,232 21,379
MMBtu
Coal $28,944 15,196
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,116 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Coal Savings
01 2.2437: Recover waste heat from equipment $29,083 $135,000 - $15,123
-
MMBtu
$13,960
-
MMBtu
02 2.7491: Insulate glazing, walls, ceilings, and roofs $18,916 $30,800 - $9,836
-
MMBtu
$9,080
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,402 $900 $15,402
331,770
kWh
- -
04 2.4133: Use most efficient type of electric motors $7,791 $7,970 $7,791
167,351
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,101 $1,580 $3,101
66,530
kWh
- -
06 2.2437: Recover waste heat from equipment $2,621 $260 $2,621
56,272
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $202 $690 $202
4,396
kWh
- -
TOTAL RECOMMENDED $77,116 $177,200 $29,117
626,319
kWh
$24,959
-
MMBtu
$23,040
-
MMBtu
TOTAL IMPLEMENTED $40,040 $33,540 $21,124
454,572
kWh
$9,836
-
MMBtu
$9,080
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Coal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs