Assessment Year | 1994 |
---|---|
Principal Product | kitchen cabinets |
NAICS |
n/a
|
SIC | 2434: Wood Kitchen Cabinets |
Sales Range | $10 M to 50M |
# of Employees | 400 |
Plant Area |
300,000
ft2
|
Annual Production | 400,000
pieces
|
Production Hrs. Annual | 4,575
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $387,482 | 8,131,594 |
kWh
|
$0.048 |
Natural Gas | $98,232 | 21,379 |
MMBtu
|
$4.59 |
Coal | $28,944 | 15,196 |
MMBtu
|
$1.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $77,116 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $40,040 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Coal Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $29,083 | $135,000 | - |
$15,123
-
MMBtu
|
$13,960
-
MMBtu
|
|
02 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $18,916 | $30,800 | - |
$9,836
-
MMBtu
|
$9,080
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,402 | $900 |
$15,402
331,770
kWh
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $7,791 | $7,970 |
$7,791
167,351
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,101 | $1,580 |
$3,101
66,530
kWh
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $2,621 | $260 |
$2,621
56,272
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $202 | $690 |
$202
4,396
kWh
|
- | - | |
TOTAL RECOMMENDED | $77,116 | $177,200 |
$29,117
626,319
kWh
|
$24,959
-
MMBtu
|
$23,040
-
MMBtu
|
||
TOTAL IMPLEMENTED | $40,040 | $33,540 |
$21,124
454,572
kWh
|
$9,836
-
MMBtu
|
$9,080
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Coal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs