ITAC Assessment: ND0188
ITAC logo
ITAC Assessment: ND0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Cast Aluminum Wheels
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 58,000
ft2
Annual Production 350,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $319,491 7,021,395
kWh
Natural Gas $173,804 44,759
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,369 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,448

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $13,218 $10,190 $13,218
319,754
kWh
-
02 2.3212: Optimize plant power factor $4,736 $3,046 $4,736
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,039 $1,365 $1,039
25,205
kWh
-
04 2.6218: Turn off equipment when not in use $494 - $494
12,016
kWh
-
05 2.2514: Cover open tanks $276 $642 - $276
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $110 $320 $110
2,638
kWh
-
07 2.7111: Reduce illumination to minimum necessary levels $6,241 $300 $6,241
150,938
kWh
-
08 2.2221: Use immersion heating in tanks, melting pots, etc $11,255 $26,000 - $11,255
-
MMBtu
TOTAL RECOMMENDED $37,369 $41,863 $25,838
510,551
kWh
$11,531
-
MMBtu
TOTAL IMPLEMENTED $18,448 $13,236 $18,448
331,770
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs