ITAC Assessment: ND0185
ITAC logo
ITAC Assessment: ND0185
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Machine Tools
NAICS
n/a
SIC 3542: Machine Tools, Metal Forming Types
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 56,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,400
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,024 1,254,103
kWh
LPG $18,300 2,898
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,854 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $5,444 $6,810 n/a $5,444
77,081
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,014 $1,488 n/a $2,014
28,429
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,529 $500 n/a $1,529
21,688
kWh
04 2.4221: Install compressor air intakes in coolest locations $560 $200 n/a $560
7,913
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $307 $525 n/a $307
4,396
kWh
TOTAL RECOMMENDED $9,854 $9,523 $9,854
139,507
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs