ITAC Assessment: ND0180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Pressure controls
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 40,000
ft2
Annual Production 65,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,201 504,982
kWh
Natural Gas $9,809 1,848
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,076 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,992

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $1,944 $194 $1,944
20,516
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $921 $3,770 $921
9,672
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,748 $250 - $2,748
04 2.7111: Reduce illumination to minimum necessary levels $813 $90 $813
8,499
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $157 $140 $157
1,758
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $350 $150 $350
3,810
kWh
-
07 2.4133: Use most efficient type of electric motors $143 $110 $143
1,465
kWh
-
TOTAL RECOMMENDED $7,076 $4,704 $4,328
45,720
kWh
$2,748
TOTAL IMPLEMENTED $4,992 $694 $2,244
23,739
kWh
$2,748
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs