ITAC Assessment: ND0174
ITAC logo
ITAC Assessment: ND0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Reinforced Fiberglass Electrical Box
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 195,000
ft2
Annual Production 36,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $396,526 8,868,113
kWh
Natural Gas $13,292 2,536
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,261 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,164

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $3,033 $3,875 $3,033
67,702
kWh
02 2.3212: Optimize plant power factor $1,428 $4,920 $1,428
-
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,131 $1,061 $1,131
25,205
kWh
04 2.3212: Optimize plant power factor $507 $810 $507
-
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $162 $450 $162
3,517
kWh
TOTAL RECOMMENDED $6,261 $11,116 $6,261
96,424
kWh
TOTAL IMPLEMENTED $4,164 $4,936 $4,164
92,907
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs