ITAC Assessment: ND0039
ITAC logo
ITAC Assessment: ND0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PRINTING
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area
n/a
Annual Production 873
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,059 1,984,760
kWh
Natural Gas $37,006 9,590
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1221: Replace obsolete burners with more efficient ones $15,089 $58,000 - $11,329
-
MMBtu
$3,760
02 2.1233: Analyze flue gas for proper air/fuel ratio $571 $1,000 - $571
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $993 $8,080 $993
21,395
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,944 $1,754 $2,599
54,513
kWh
- $(-655.0)
05 2.2511: Insulate bare equipment $463 $1,000 - $463
-
MMBtu
-
06 2.7492: Use proper thickness of insulation on building envelope $290 $64 - $290
-
MMBtu
-
TOTAL RECOMMENDED $19,350 $69,898 $3,592
75,908
kWh
$12,653
-
MMBtu
$3,105
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs