ITAC Assessment: ND0036
ITAC logo
ITAC Assessment: ND0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product LEAD OXIDE
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area
n/a
Annual Production 77,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $648,064 9,991,501
kWh
Natural Gas $37,006 9,589
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,414 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,446

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $5,446 $22,730 $5,446
84,115
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,058 $885 $1,255
19,343
kWh
$(-197.0)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $645 $300 $645
9,965
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $265 $340 $265
4,103
kWh
-
TOTAL RECOMMENDED $7,414 $24,255 $7,611
117,526
kWh
$(-197.0)
TOTAL IMPLEMENTED $5,446 $22,730 $5,446
84,115
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs