ITAC Assessment: ND0011
ITAC logo
ITAC Assessment: ND0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product SNACK FOOD
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area
n/a
Annual Production 100,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $964,603 25,216,003
kWh
Natural Gas $499,878 345,073
MMBtu
Coal $353,233 191,163
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,256 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,047

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Coal Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $41,503 $2,000 - $14,783
-
MMBtu
$26,720
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $5,123 $9,103 $5,123
136,284
kWh
- - -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $14,515 - - - - $14,515
04 2.3212: Optimize plant power factor $11,735 $35,163 $11,735
-
kWh
- - -
05 3.4113: Treat and reuse rinse waters $9,694 - - - - $9,694
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,996 - $6,010
162,075
kWh
- - $(-3,014.0)
07 2.2437: Recover waste heat from equipment $3,544 $700 - $3,544
-
MMBtu
- -
08 2.2113: Repair or replace steam traps $146 $250 - $146
-
MMBtu
- -
TOTAL RECOMMENDED $89,256 $47,216 $22,868
298,359
kWh
$18,473
-
MMBtu
$26,720
-
MMBtu
$21,195
TOTAL IMPLEMENTED $65,047 $47,216 $22,868
298,359
kWh
$18,473
-
MMBtu
$26,720
-
MMBtu
$(-3,014.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Coal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs