| Assessment Year | 2021 |
|---|---|
| Principal Product | Water / wastewater |
| NAICS | 221310: Water Supply and Irrigation Systems |
| SIC | 4941: Water Supply |
| Sales Range | $10 M to 50M |
| # of Employees | 63 |
| Plant Area |
70,000
ft2
|
| Annual Production | 3,600,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $546,728 | 7,121,024 |
kWh
|
$0.077 | |
| Electricity Demand | $76,984 | 16,813 |
kW-mo/yr
|
$4.58 | |
| Waste Disposal Costs | |||||
| Water Usage | $1 | 1 |
Tgal
|
$1.00 | |
| TOTAL YEARLY COSTS | $623,713 | ||||
| RECOMMENDED SAVINGS* | $19,478 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,718 | $4,219 |
$2,514
35,160
kWh
|
$204
-
kW-mo/yr
|
|
| 02 | 2.8114: Change rate schedules or other changes in utility service | $16,598 | $1,000 |
$104,706
-
kWh
|
$(-88,108.0)
-
kW-mo/yr
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $75 | $300 |
$53
980
kWh
|
$22
-
kW-mo/yr
|
|
| 04 | 2.7135: Install occupancy sensors | $87 | $300 |
$87
1,140
kWh
|
- | |
| TOTAL RECOMMENDED | $19,478 | $5,819 |
$107,360
37,280
kWh
|
$(-87,882.0)
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs