ITAC Assessment: MA0592
ITAC logo
ITAC Assessment: MA0592
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product High performance plastic sheet
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 144
Plant Area 100,000
ft2
Annual Production 262,800
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $796,728 9,001,800
kWh
Electricity Demand $61,614 49,440
kW-mo/yr
Electricity Fees $9,229 -
Natural Gas $274,178 32,085
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $172,673 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,621

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $74,191 $368,500 $104,065
1,200,400
kWh
$15,367
-
kW-mo/yr
$(-45,241.0)
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $56,494 $73,748 - - $56,494
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $33,861 $138,775 $31,506
363,400
kWh
$2,355
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,789 - $4,466
51,500
kWh
$323
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,338 $3,295 $3,338
38,500
kWh
- -
TOTAL RECOMMENDED $172,673 $584,318 $143,375
1,653,800
kWh
$18,045
-
kW-mo/yr
$11,253
-
MMBtu
TOTAL IMPLEMENTED $64,621 $77,043 $7,804
90,000
kWh
$323
-
kW-mo/yr
$56,494
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs