Assessment Year | 2005 |
---|---|
Principal Product | High performance plastic sheet |
NAICS | 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $10 M to 50M |
# of Employees | 144 |
Plant Area |
100,000
ft2
|
Annual Production | 262,800
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Rhode Island |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $796,728 | 9,001,800 |
kWh
|
$0.089 |
Electricity Demand | $61,614 | 49,440 |
kW-mo/yr
|
$1.25 |
Electricity Fees | $9,229 | - |
|
- |
Natural Gas | $274,178 | 32,085 |
MMBtu
|
$8.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $172,673 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $64,621 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $74,191 | $368,500 |
$104,065
1,200,400
kWh
|
$15,367
-
kW-mo/yr
|
$(-45,241.0)
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $56,494 | $73,748 | - | - |
$56,494
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $33,861 | $138,775 |
$31,506
363,400
kWh
|
$2,355
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,789 | - |
$4,466
51,500
kWh
|
$323
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,338 | $3,295 |
$3,338
38,500
kWh
|
- | - | |
TOTAL RECOMMENDED | $172,673 | $584,318 |
$143,375
1,653,800
kWh
|
$18,045
-
kW-mo/yr
|
$11,253
-
MMBtu
|
||
TOTAL IMPLEMENTED | $64,621 | $77,043 |
$7,804
90,000
kWh
|
$323
-
kW-mo/yr
|
$56,494
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs