Assessment Year | 2021 |
---|---|
Principal Product | Power line components |
NAICS | 335932: Noncurrent-Carrying Wiring Device Manufacturing |
SIC | 3644: Noncurrent-Carrying Wiring Devices |
Sales Range | $50 M to 100M |
# of Employees | 225 |
Plant Area |
288,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 8,600
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $550,201 | 8,778,154 |
kWh
|
$0.063 | |
Electricity Demand | $148,628 | 20,841 |
kW-mo/yr
|
$7.13 | |
Electricity Fees | $598 | - |
|
- | |
Natural Gas | $36,827 | 4,180 |
MMBtu
|
$8.81 | |
Waste Disposal Costs | |||||
Water Usage | $1 | 1 |
Tgal
|
$1.00 | |
TOTAL YEARLY COSTS | $736,255 | ||||
RECOMMENDED SAVINGS* | $121,695 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,757 | $2,000 |
$3,875
61,800
kWh
|
$882
-
kW-mo/yr
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $4,792 | $5,472 | - | - |
$4,792
-
MMBtu
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,634 | $39,970 |
$16,929
270,000
kWh
|
$3,850
-
kW-mo/yr
|
$(-10,145.0)
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,566 | $3,150 |
$3,566
56,875
kWh
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $64 | $280 |
$64
1,020
kWh
|
- | - | - | |
06 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $19,234 | $75,000 |
$30,437
485,440
kWh
|
$9,412
-
kW-mo/yr
|
$(-20,615.0)
-
MMBtu
|
- | |
07 | 2.4322: Use or replace with energy efficient substitutes | $78,648 | $250,000 |
$27,517
438,860
kWh
|
$3,131
-
kW-mo/yr
|
- | $48,000 | |
TOTAL RECOMMENDED | $121,695 | $375,872 |
$82,388
1,313,995
kWh
|
$17,275
-
kW-mo/yr
|
$(-25,968.0)
-
MMBtu
|
$48,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs