ITAC Assessment: NC0662
ITAC logo
ITAC Assessment: NC0662
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Power line components
NAICS 335932: Noncurrent-Carrying Wiring Device Manufacturing
SIC 3644: Noncurrent-Carrying Wiring Devices
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 288,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 8,600
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $550,201 8,778,154
kWh
Electricity Demand $148,628 20,841
kW-mo/yr
Electricity Fees $598 -
Natural Gas $36,827 4,180
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $736,255
RECOMMENDED SAVINGS* $121,695 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,757 $2,000 $3,875
61,800
kWh
$882
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $4,792 $5,472 - - $4,792
-
MMBtu
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,634 $39,970 $16,929
270,000
kWh
$3,850
-
kW-mo/yr
$(-10,145.0)
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,566 $3,150 $3,566
56,875
kWh
- - -
05 2.7135: Install occupancy sensors $64 $280 $64
1,020
kWh
- - -
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $19,234 $75,000 $30,437
485,440
kWh
$9,412
-
kW-mo/yr
$(-20,615.0)
-
MMBtu
-
07 2.4322: Use or replace with energy efficient substitutes $78,648 $250,000 $27,517
438,860
kWh
$3,131
-
kW-mo/yr
- $48,000
TOTAL RECOMMENDED $121,695 $375,872 $82,388
1,313,995
kWh
$17,275
-
kW-mo/yr
$(-25,968.0)
-
MMBtu
$48,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs