ITAC Assessment: NC0656
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Saw blades
NAICS 332216: Saw Blade and Handtool Manufacturing
SIC 3425: Saw Blades and Handsaws
Sales Range $50
M
to 100
M
# of Employees 475
Plant Area 225,380
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $853,779 12,091,670
kWh
Electricity Demand $147,031 37,653
kW-mo/yr
Electricity Fees $43,971 -
Natural Gas $38,992 4,731
MMBtu
Waste Disposal Costs
Water Usage $2,400 132
Tgal
TOTAL YEARLY COSTS $1,086,173
RECOMMENDED SAVINGS* $84,639 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $21,457 $44,289 - - $21,457
-
MMBtu
02 2.8114: Change rate schedules or other changes in utility service $39,666 $500 - $39,666
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $10,304 $2,048 $10,304
145,950
kWh
- -
04 2.9114: Use solar heat to make electricty $13,212 $111,000 $8,472
120,000
kWh
$4,740
-
kW-mo/yr
-
TOTAL RECOMMENDED $84,639 $157,837 $18,776
265,950
kWh
$44,406
-
kW-mo/yr
$21,457
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs