ITAC Assessment: NC0641
ITAC logo
ITAC Assessment: NC0641
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Plastic mesh bags
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 44,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $429,510 5,915,800
kWh
Electricity Demand $54,918 12,922
kW-mo/yr
Electricity Fees $297 -
Natural Gas $20,706 2,859
MMBtu
TOTAL YEARLY COSTS $505,431
RECOMMENDED SAVINGS* $53,044 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,143

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,164 $120 $1,042
14,350
kWh
$122
-
kW-mo/yr
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $18,554 $21,000 $26,572
366,000
kWh
$3,111
-
kW-mo/yr
$(-11,129.0)
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $29,143 $35,000 $26,101
359,520
kWh
$3,042
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,183 $16,246 $3,648
50,245
kWh
$535
-
kW-mo/yr
-
TOTAL RECOMMENDED $53,044 $72,366 $57,363
790,115
kWh
$6,810
-
kW-mo/yr
$(-11,129.0)
-
MMBtu
TOTAL IMPLEMENTED $29,143 $35,000 $26,101
359,520
kWh
$3,042
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs