ITAC Assessment: NC0638
ITAC logo
ITAC Assessment: NC0638
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Elastic fabrics
NAICS 313220: Narrow Fabric Mills and Schiffli Machine Embroidery
SIC 2241: Narrow Fabric and Other Smallware Mills: Cotton, Wool, Silk, and Manmade Fiber
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 150,000
ft2
Annual Production 4,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $438,377 11,395,068
kWh
Electricity Demand $240,090 21,018
kW-mo/yr
Electricity Fees $384 -
Natural Gas $668,454 160,103
MMBtu
TOTAL YEARLY COSTS $1,347,305
RECOMMENDED SAVINGS* $32,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $18,797 $85,000 - $18,797
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $5,807 $3,600 - $5,807
-
MMBtu
03 2.2449: Recover heat from exhausted steam, hot air or hot water $6,164 $6,700 - $6,164
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $544 $2,464 $544
14,357
kWh
-
05 2.7135: Install occupancy sensors $1,065 $1,900 $1,065
28,080
kWh
-
TOTAL RECOMMENDED $32,377 $99,664 $1,609
42,437
kWh
$30,768
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs