ITAC Assessment: NC0632
ITAC logo
ITAC Assessment: NC0632
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Cabinets
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 450,000
ft2
Annual Production 800,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $502,121 8,229,000
kWh
Electricity Demand $120,480 27,313
kW-mo/yr
Wood $1 17,500
MMBtu
TOTAL YEARLY COSTS $622,602
RECOMMENDED SAVINGS* $50,409 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,384

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,842 $21,173 $4,326
70,920
kWh
$1,516
-
kW-mo/yr
02 2.7135: Install occupancy sensors $183 $400 $183
2,992
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $739 $360 $657
10,777
kWh
$82
-
kW-mo/yr
04 2.4224: Upgrade controls on compressors $357 $500 $357
5,850
kWh
-
05 2.8114: Change rate schedules or other changes in utility service $43,288 $500 $43,288
-
kWh
-
TOTAL RECOMMENDED $50,409 $22,933 $48,811
90,539
kWh
$1,598
-
kW-mo/yr
TOTAL IMPLEMENTED $44,384 $1,360 $44,302
16,627
kWh
$82
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs