ITAC Assessment: NC0630
ITAC logo
ITAC Assessment: NC0630
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Furniture
NAICS 337122: Nonupholstered Wood Household Furniture Manufacturing
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 66
Plant Area 111,000
ft2
Annual Production 122,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,505 5,010,428
kWh
Electricity Demand $44,734 10,608
kW-mo/yr
Wood $28,173 10,016
MMBtu
TOTAL YEARLY COSTS $339,412
RECOMMENDED SAVINGS* $25,146 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,828

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,928 $68,859 $16,972
319,026
kWh
$2,956
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $472 $100 $407
7,654
kWh
$65
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $1,108 $1,892 $1,108
20,822
kWh
- -
04 2.2437: Recover waste heat from equipment $1,318 $4,000 - - $1,318
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,320 $1,855 $2,003
37,652
kWh
$317
-
kW-mo/yr
-
TOTAL RECOMMENDED $25,146 $76,706 $20,490
385,154
kWh
$3,338
-
kW-mo/yr
$1,318
-
MMBtu
TOTAL IMPLEMENTED $23,828 $72,706 $20,490
385,154
kWh
$3,338
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs