ITAC Assessment: NC0621
ITAC logo
ITAC Assessment: NC0621
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Hoses
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 173,000
ft2
Annual Production 4,000,000
units
Production Hrs. Annual 6,600
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $212,975 3,338,420
kWh
Electricity Demand $53,478 12,322
kW-mo/yr
Natural Gas $206,912 45,118
MMBtu
TOTAL YEARLY COSTS $473,365
RECOMMENDED SAVINGS* $52,963 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $22,870 $54,127 $20,061
314,442
kWh
$2,809
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $134 $150 $134
2,100
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,222 $390 $5,865
91,931
kWh
$747
-
kW-mo/yr
- $(-300.0) $(-90.0)
04 2.2136: Install / repair insulation on steam lines $6,697 $5,350 - - $6,697
-
MMBtu
- -
05 2.2121: Increase amount of condensate returned $943 $1,000 - - $943
-
MMBtu
- -
06 2.8114: Change rate schedules or other changes in utility service $16,097 $500 $16,097
-
kWh
- - - -
TOTAL RECOMMENDED $52,963 $61,517 $42,157
408,473
kWh
$3,556
-
kW-mo/yr
$7,640
-
MMBtu
$(-300.0) $(-90.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs