ITAC Assessment: NC0601
ITAC logo
ITAC Assessment: NC0601
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Beef jerky
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 140,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $368,874 11,711,000
kWh
Electricity Demand $474,223 24,922
kW-mo/yr
Natural Gas $330,951 47,440
MMBtu
Waste Disposal Costs
Water Usage $592,592 27,524
Tgal
TOTAL YEARLY COSTS $1,766,640
RECOMMENDED SAVINGS* $49,978 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,049

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,641 $200 $1,397
49,191
kWh
$1,444
-
kW-mo/yr
- - $(-100.0) $(-100.0)
02 2.4239: Eliminate or reduce compressed air usage $1,840 $750 $906
31,893
kWh
$934
-
kW-mo/yr
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,606 $100 $792
27,888
kWh
$814
-
kW-mo/yr
- - - -
04 2.1232: Keep boiler tubes clean $2,408 $1,000 - - $2,408
-
MMBtu
- - -
05 2.2123: Insulate feedwater tank $792 $750 - - $792
-
MMBtu
- - -
06 2.2437: Recover waste heat from equipment $15,825 $82,000 - - $15,825
-
MMBtu
- - -
07 4.212: Adopt in-house material generation $21,773 $20,000 $(-1,861.0)
(-65,541)
kWh
$(-4,017.0)
-
kW-mo/yr
- - - $27,651
08 2.7135: Install occupancy sensors $217 $487 $173
6,079
kWh
$44
-
kW-mo/yr
- - - -
09 3.4156: Use flow control valves on equipment to optimize water use $2,876 $30 - - - $2,876
-
Tgal
- -
TOTAL RECOMMENDED $49,978 $105,317 $1,407
49,510
kWh
$(-781.0)
-
kW-mo/yr
$19,025
-
MMBtu
$2,876
-
Tgal
$(-100.0) $27,551
TOTAL IMPLEMENTED $5,049 $1,200 $1,397
49,191
kWh
$1,444
-
kW-mo/yr
$2,408
-
MMBtu
- $(-100.0) $(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs