ITAC Assessment: NC0598
ITAC logo
ITAC Assessment: NC0598
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Hot sauces
NAICS 311941: Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 70,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,867 2,453,919
kWh
Electricity Demand $27,348 6,477
kW-mo/yr
Natural Gas $43,900 6,175
MMBtu
TOTAL YEARLY COSTS $220,115
RECOMMENDED SAVINGS* $21,036 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,545

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,448 $18,822 $3,104
51,131
kWh
$673
-
kW-mo/yr
- - $671
02 2.7135: Install occupancy sensors $165 $547 $165
2,720
kWh
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,199 $50 $993
16,357
kWh
$206
-
kW-mo/yr
- - -
04 2.4239: Eliminate or reduce compressed air usage $2,276 $1,050 $2,276
37,500
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $932 $100 $1,169
19,265
kWh
$163
-
kW-mo/yr
- $(-200.0) $(-200.0)
06 2.2511: Insulate bare equipment $432 $500 - - $432
-
MMBtu
- -
07 2.8114: Change rate schedules or other changes in utility service $11,584 $500 $11,584
-
kWh
- - - -
TOTAL RECOMMENDED $21,036 $21,569 $19,291
126,973
kWh
$1,042
-
kW-mo/yr
$432
-
MMBtu
$(-200.0) $471
TOTAL IMPLEMENTED $5,545 $19,469 $4,438
73,116
kWh
$836
-
kW-mo/yr
- $(-200.0) $471