| Assessment Year | 2017 |
|---|---|
| Principal Product | Socks |
| NAICS | 315110: Hosiery and Sock Mills |
| SIC | 2252: Hosiery, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 185 |
| Plant Area |
130,000
ft2
|
| Annual Production | 6,300,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $212,284 | 4,822,200 |
kWh
|
$0.044 |
| Electricity Demand | $122,915 | 10,401 |
kW-mo/yr
|
$11.82 |
| Natural Gas | $107,000 | 10,693 |
MMBtu
|
$10.01 |
| TOTAL YEARLY COSTS | $442,199 | |||
| RECOMMENDED SAVINGS* | $35,132 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,787 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,435 | $144,553 |
$18,325
411,798
kWh
|
$11,110
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $896 | $100 |
$852
19,156
kWh
|
$444
-
kW-mo/yr
|
- | $(-200.0) | $(-200.0) | |
| 03 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $375 | $552 |
$245
5,500
kWh
|
$130
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.2521: Isolate steam lines to avoid heating air conditioned areas | $3,516 | $400 |
$761
17,100
kWh
|
$405
-
kW-mo/yr
|
$2,350
-
MMBtu
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $910 | $2,000 | - | - |
$910
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $35,132 | $147,605 |
$20,183
453,554
kWh
|
$12,089
-
kW-mo/yr
|
$3,260
-
MMBtu
|
$(-200.0) | $(-200.0) | ||
| TOTAL IMPLEMENTED | $4,787 | $1,052 |
$1,858
41,756
kWh
|
$979
-
kW-mo/yr
|
$2,350
-
MMBtu
|
$(-200.0) | $(-200.0) | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs