| Assessment Year | 2017 |
|---|---|
| Principal Product | Office casegoods furniture |
| NAICS | 337211: Wood Office Furniture Manufacturing |
| SIC | 2521: Wood Office Furniture |
| Sales Range | $10 M to 50M |
| # of Employees | 192 |
| Plant Area |
250,000
ft2
|
| Annual Production | 48,155
pieces
|
| Production Hrs. Annual | 2,375
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $319,311 | 5,180,160 |
kWh
|
$0.062 |
| Electricity Demand | $83,938 | 18,778 |
kW-mo/yr
|
$4.47 |
| Natural Gas | $71,053 | 10,369 |
MMBtu
|
$6.85 |
| Wood | $93,986 | 37,600 |
MMBtu
|
$2.50 |
| TOTAL YEARLY COSTS | $568,288 | |||
| RECOMMENDED SAVINGS* | $53,762 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $43,643 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $30,408 | $87,579 |
$18,785
304,464
kWh
|
$6,905
-
kW-mo/yr
|
- | - | $4,718 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,501 | $4,590 |
$1,414
22,916
kWh
|
- | - | - | $87 | |
| 03 | 2.7134: Use photocell controls | $52 | $100 |
$52
842
kWh
|
- | - | - | - | |
| 04 | 2.7313: Recycle air for heating, ventilation and air conditioning | $9,474 | $24,000 | - | - |
$9,474
-
MMBtu
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,208 | $200 |
$1,799
29,165
kWh
|
$659
-
kW-mo/yr
|
- | $(-100.0) | $(-150.0) | |
| 06 | 2.4226: Use / purchase optimum sized compressor | $10,119 | $20,000 |
$7,407
120,051
kWh
|
$2,712
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $53,762 | $136,469 |
$29,457
477,438
kWh
|
$10,276
-
kW-mo/yr
|
$9,474
-
MMBtu
|
$(-100.0) | $4,655 | ||
| TOTAL IMPLEMENTED | $43,643 | $116,469 |
$22,050
357,387
kWh
|
$7,564
-
kW-mo/yr
|
$9,474
-
MMBtu
|
$(-100.0) | $4,655 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs