Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Office casegoods furniture
NAICS 337211: Wood Office Furniture Manufacturing
SIC 2521: Wood Office Furniture
Sales Range $10
M
to 50
M
# of Employees 192
Plant Area 250,000
ft2
Annual Production 48,155
pieces
Production Hrs. Annual 2,375
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $319,311 5,180,160
kWh
Electricity Demand $83,938 18,778
kW-mo/yr
Natural Gas $71,053 10,369
MMBtu
Wood $93,986 37,600
MMBtu
TOTAL YEARLY COSTS $568,288
RECOMMENDED SAVINGS* $53,762 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,643

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $30,408 $87,579 $18,785
304,464
kWh
$6,905
-
kW-mo/yr
- - $4,718
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,501 $4,590 $1,414
22,916
kWh
- - - $87
03 2.7134: Use photocell controls $52 $100 $52
842
kWh
- - - -
04 2.7313: Recycle air for heating, ventilation and air conditioning $9,474 $24,000 - - $9,474
-
MMBtu
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,208 $200 $1,799
29,165
kWh
$659
-
kW-mo/yr
- $(-100.0) $(-150.0)
06 2.4226: Use / purchase optimum sized compressor $10,119 $20,000 $7,407
120,051
kWh
$2,712
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $53,762 $136,469 $29,457
477,438
kWh
$10,276
-
kW-mo/yr
$9,474
-
MMBtu
$(-100.0) $4,655
TOTAL IMPLEMENTED $43,643 $116,469 $22,050
357,387
kWh
$7,564
-
kW-mo/yr
$9,474
-
MMBtu
$(-100.0) $4,655
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs