| Assessment Year | 2016 |
|---|---|
| Principal Product | Remanufactured truck parts |
| NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $10 M to 50M |
| # of Employees | 40 |
| Plant Area |
210,000
ft2
|
| Annual Production | 3,000,000
lb
|
| Production Hrs. Annual | 2,100
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $39,130 | 777,600 |
kWh
|
$0.050 |
| Electricity Demand | $45,860 | 3,307 |
kW-mo/yr
|
$13.87 |
| Electricity Fees | $534 | - |
|
- |
| LPG | $22,928 | 1,371 |
MMBtu
|
$16.72 |
| TOTAL YEARLY COSTS | $108,452 | |||
| RECOMMENDED SAVINGS* | $29,728 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,316 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $13,396 | $500 |
$(-15,727.0)
-
kWh
|
$29,480
-
kW-mo/yr
|
$(-357.0) | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,397 | $11,899 |
$1,255
24,947
kWh
|
$1,746
-
kW-mo/yr
|
- | $396 | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,551 | $26,597 |
$3,810
75,752
kWh
|
$5,368
-
kW-mo/yr
|
- | $373 | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,735 | $3,575 |
$1,536
30,498
kWh
|
- | - | $199 | |
| 05 | 2.7135: Install occupancy sensors | $1,016 | $3,071 |
$1,016
20,208
kWh
|
- | - | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $633 | $50 |
$263
5,226
kWh
|
$370
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $29,728 | $45,692 |
$(-7,847.0)
156,631
kWh
|
$36,964
-
kW-mo/yr
|
$(-357.0) | $968 | ||
| TOTAL IMPLEMENTED | $15,316 | $42,121 |
$6,864
136,423
kWh
|
$7,484
-
kW-mo/yr
|
- | $968 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs