Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Remanufactured truck parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 210,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 2,100
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,130 777,600
kWh
Electricity Demand $45,860 3,307
kW-mo/yr
Electricity Fees $534 -
LPG $22,928 1,371
MMBtu
TOTAL YEARLY COSTS $108,452
RECOMMENDED SAVINGS* $29,728 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,316

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $13,396 $500 $(-15,727.0)
-
kWh
$29,480
-
kW-mo/yr
$(-357.0) -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,397 $11,899 $1,255
24,947
kWh
$1,746
-
kW-mo/yr
- $396
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,551 $26,597 $3,810
75,752
kWh
$5,368
-
kW-mo/yr
- $373
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,735 $3,575 $1,536
30,498
kWh
- - $199
05 2.7135: Install occupancy sensors $1,016 $3,071 $1,016
20,208
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $633 $50 $263
5,226
kWh
$370
-
kW-mo/yr
- -
TOTAL RECOMMENDED $29,728 $45,692 $(-7,847.0)
156,631
kWh
$36,964
-
kW-mo/yr
$(-357.0) $968
TOTAL IMPLEMENTED $15,316 $42,121 $6,864
136,423
kWh
$7,484
-
kW-mo/yr
- $968
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs