| Assessment Year | 2016 |
|---|---|
| Principal Product | Non-woven fabric |
| NAICS | 313230: Nonwoven Fabric Mills |
| SIC | 2297: Non-woven Fabrics |
| Sales Range | $50 M to 100M |
| # of Employees | 150 |
| Plant Area |
160,000
ft2
|
| Annual Production | 32,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $3,709,398 | 67,474,143 |
kWh
|
$0.055 |
| Electricity Demand | $1,034,374 | 105,185 |
kW-mo/yr
|
$9.83 |
| Natural Gas | $496,923 | 89,084 |
MMBtu
|
$5.58 |
| TOTAL YEARLY COSTS | $5,240,695 | |||
| RECOMMENDED SAVINGS* | $384,172 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $125,224 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $16,790 | $3,000 | - | - |
$16,790
-
MMBtu
|
|
| 02 | 2.2113: Repair or replace steam traps | $108,434 | $80,000 | - | - |
$108,434
-
MMBtu
|
|
| 03 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $198,172 | $1,100,000 |
$484,000
8,800,000
kWh
|
$129,756
-
kW-mo/yr
|
$(-415,584.0)
-
MMBtu
|
|
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $60,776 | $250,000 |
$79,200
1,440,000
kWh
|
$21,233
-
kW-mo/yr
|
$(-39,657.0)
-
MMBtu
|
|
| TOTAL RECOMMENDED | $384,172 | $1,433,000 |
$563,200
10,240,000
kWh
|
$150,989
-
kW-mo/yr
|
$(-330,017.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $125,224 | $83,000 | - | - |
$125,224
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs