ITAC Assessment: NC0576
ITAC logo
ITAC Assessment: NC0576
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Non-woven fabric
NAICS 313230: Nonwoven Fabric Mills
SIC 2297: Non-woven Fabrics
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 160,000
ft2
Annual Production 32,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,709,398 67,474,143
kWh
Electricity Demand $1,034,374 105,185
kW-mo/yr
Natural Gas $496,923 89,084
MMBtu
TOTAL YEARLY COSTS $5,240,695
RECOMMENDED SAVINGS* $384,172 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $125,224

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $16,790 $3,000 - - $16,790
-
MMBtu
02 2.2113: Repair or replace steam traps $108,434 $80,000 - - $108,434
-
MMBtu
03 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $198,172 $1,100,000 $484,000
8,800,000
kWh
$129,756
-
kW-mo/yr
$(-415,584.0)
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $60,776 $250,000 $79,200
1,440,000
kWh
$21,233
-
kW-mo/yr
$(-39,657.0)
-
MMBtu
TOTAL RECOMMENDED $384,172 $1,433,000 $563,200
10,240,000
kWh
$150,989
-
kW-mo/yr
$(-330,017.0)
-
MMBtu
TOTAL IMPLEMENTED $125,224 $83,000 - - $125,224
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs