Assessment Year | 2016 |
---|---|
Principal Product | Testing equipment |
NAICS | 334516: Analytical Laboratory Instrument Manufacturing |
SIC | 3826: Laboratory Analytical Instruments |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
100,000
ft2
|
Annual Production | 1,000
pieces
|
Production Hrs. Annual | 3,060
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,972 | 1,112,400 |
kWh
|
$0.065 |
Electricity Demand | $21,194 | 4,752 |
kW-mo/yr
|
$4.46 |
TOTAL YEARLY COSTS | $93,166 | |||
RECOMMENDED SAVINGS* | $27,261 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,615 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8118: Check for accuracy of utility / power meters | $2,610 | $100 | - |
$2,610
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,606 | $76,556 |
$11,986
185,251
kWh
|
$3,459
-
kW-mo/yr
|
- | $4,161 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,685 | $13,453 |
$3,140
48,537
kWh
|
- | - | $545 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $105 | $200 |
$358
5,539
kWh
|
$97
-
kW-mo/yr
|
$(-150.0) | $(-200.0) | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $219 | $100 |
$172
2,665
kWh
|
$47
-
kW-mo/yr
|
- | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $418 | $75 |
$418
6,454
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $618 | $160 |
$277
4,275
kWh
|
$26
-
kW-mo/yr
|
- | $315 | |
TOTAL RECOMMENDED | $27,261 | $90,644 |
$16,351
252,721
kWh
|
$6,239
-
kW-mo/yr
|
$(-150.0) | $4,821 | ||
TOTAL IMPLEMENTED | $23,615 | $90,309 |
$15,656
241,992
kWh
|
$3,603
-
kW-mo/yr
|
$(-150.0) | $4,506 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs