ITAC Assessment: IP0053
ITAC logo
ITAC Assessment: IP0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product soybean meal, pellets, oil
NAICS 311224: Soybean and Other Oilseed Processing
SIC 2075: Soybean Oil Mills
Sales Range greater than $500
M
# of Employees 56
Plant Area 350,000
ft2
Annual Production 937,341
ton
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,811,898 30,762,000
kWh
Electricity Demand $588,282 51,877
kW-mo/yr
Electricity Fees $1,800 -
Natural Gas $4,013,557 697,766
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,734 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $101,734

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $57,305 $915 - - $57,305
-
MMBtu
-
02 2.7135: Install occupancy sensors $1,294 $160 $1,294
21,966
kWh
- - -
03 4.812: Apply for investment incentives $38,029 $5,000 - - - $38,029
04 2.4221: Install compressor air intakes in coolest locations $4,650 $2,685 $3,680
62,487
kWh
$970
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $456 $924 $361
6,132
kWh
$95
-
kW-mo/yr
- -
TOTAL RECOMMENDED $101,734 $9,684 $5,335
90,585
kWh
$1,065
-
kW-mo/yr
$57,305
-
MMBtu
$38,029
TOTAL IMPLEMENTED $101,734 $9,684 $5,335
90,585
kWh
$1,065
-
kW-mo/yr
$57,305
-
MMBtu
$38,029
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs