Assessment Year | 2015 |
---|---|
Principal Product | Organic peroxides |
NAICS | 325199: All Other Basic Organic Chemical Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 16 |
Plant Area |
50,000
ft2
|
Annual Production | 4,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $178,277 | 2,875,436 |
kWh
|
$0.062 |
Other Energy | $285,156 | 43,661 |
MMBtu
|
$6.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $137,889 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Energy Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2161: Optimize operation of multi-stage vacuum steam jets | $88,496 | $300,000 |
$(-47,270.0)
(-762,412)
kWh
|
$145,766
-
MMBtu
|
- | $(-10,000.0) | |
02 | 2.2437: Recover waste heat from equipment | $15,080 | $10,000 |
$15,080
248,220
kWh
|
- | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $12,195 | $9,000 |
$4,720
76,127
kWh
|
- | - | $7,475 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,004 | $100 |
$4,733
76,345
kWh
|
- | $(-600.0) | $3,871 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,199 | $15,557 |
$5,222
84,219
kWh
|
- | - | $977 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,475 | $347 |
$2,031
32,762
kWh
|
- | - | $1,444 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,618 | $1,873 |
$2,889
46,603
kWh
|
- | - | $(-1,271.0) | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $314 | $206 |
$289
4,669
kWh
|
- | - | $25 | |
09 | 2.2136: Install / repair insulation on steam lines | $2,508 | $351 | - |
$2,508
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $137,889 | $337,434 |
$(-12,306.0)
(-193,467)
kWh
|
$148,274
-
MMBtu
|
$(-600.0) | $2,521 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Energy Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs