ITAC Assessment: NC0515
ITAC logo
ITAC Assessment: NC0515
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product High voltage cable
NAICS 335929: Other Communication and Energy Wire Manufacturing
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 303,281
ft2
Annual Production 1,970
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $350,803 10,726,394
kWh
Electricity Demand $130,036 20,074
kW-mo/yr
Electricity Fees $(-70,781.0) -
Natural Gas $57,583 6,356
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 4.212: Adopt in-house material generation $26,905 $50,000 $(-7,663.0)
(-234,346)
kWh
$(-3,032.0)
-
kW-mo/yr
- $(-2,400.0) $40,000
02 2.7135: Install occupancy sensors $3,351 $1,591 $3,351
102,464
kWh
- - - -
03 2.7124: Make a practice of turning off lights when not needed $1,741 $7,000 $1,741
53,246
kWh
- - - -
04 2.7111: Reduce illumination to minimum necessary levels $66 $25 $30
924
kWh
$17
-
kW-mo/yr
- - $19
05 2.7134: Use photocell controls $165 $160 $165
5,040
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $390 $990 $64
1,944
kWh
$67
-
kW-mo/yr
- - $259
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,104 $12,169 $1,705
52,135
kWh
$710
-
kW-mo/yr
- - $689
08 2.4239: Eliminate or reduce compressed air usage $2,554 $5,000 $1,830
55,950
kWh
$724
-
kW-mo/yr
- - -
09 2.2437: Recover waste heat from equipment $2,306 $5,000 - - $2,306
-
MMBtu
- -
TOTAL RECOMMENDED $40,582 $81,935 $1,223
37,357
kWh
$(-1,514.0)
-
kW-mo/yr
$2,306
-
MMBtu
$(-2,400.0) $40,967
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs