Assessment Year | 2013 |
---|---|
Principal Product | Casegood and upholstered furniture |
NAICS | 337121: Upholstered Household Furniture Manufacturing |
SIC | 2511: Wood Household Furniture, Except Upholstered |
Sales Range | $50 M to 100M |
# of Employees | 615 |
Plant Area |
500,000
ft2
|
Annual Production | 35,000
pieces
|
Production Hrs. Annual | 2,610
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $409,823 | 6,610,805 |
kWh
|
$0.062 |
Electricity Demand | $136,747 | 32,625 |
kW-mo/yr
|
$4.19 |
Electricity Fees | $(-41,731.0) | - |
|
- |
Natural Gas | $3,167 | 278 |
MMBtu
|
$11.39 |
Fuel Oil #6 | $62,412 | 3,017 |
MMBtu
|
$20.69 |
Wood | $1 | 22,890 |
MMBtu
|
$0.000 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $103,792 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $50,992 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #6 Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $20,018 | $41,400 |
$15,267
246,645
kWh
|
$4,751
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.2437: Recover waste heat from equipment | $12,186 | $1,950 | - | - | - |
$12,186
-
MMBtu
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $408 | $100 |
$723
11,682
kWh
|
$225
-
kW-mo/yr
|
- | - | - | $(-300.0) | $(-240.0) | |
04 | 2.7135: Install occupancy sensors | $2,327 | $3,547 |
$2,327
37,538
kWh
|
- | - | - | - | - | - | |
05 | 2.7134: Use photocell controls | $102 | $80 |
$102
1,650
kWh
|
- | - | - | - | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $233 | $200 |
$177
2,871
kWh
|
$56
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.5123: Reduce fluid flow rates | $5,702 | $10,000 |
$4,339
70,094
kWh
|
$1,363
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.1231: Establish burner maintenance schedule for boilers | $402 | $1,500 | - | - | - |
$402
-
MMBtu
|
- | - | - | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,666 | $1,200 | - | - | - |
$1,666
-
MMBtu
|
- | - | - | |
10 | 2.2113: Repair or replace steam traps | $9,172 | $6,200 | - | - | - |
$13,397
-
MMBtu
|
- | $(-625.0) | $(-3,600.0) | |
11 | 2.1331: Burn a less expensive grade of fuel | $37,017 | $50,000 | - | - |
$(-25,395.0)
-
MMBtu
|
$62,412
-
MMBtu
|
- | - | - | |
12 | 2.2121: Increase amount of condensate returned | $1,038 | $1,000 | - | - | - |
$280
-
MMBtu
|
$758
-
Tgal
|
- | - | |
13 | 2.2121: Increase amount of condensate returned | $1,038 | $1,000 | - | - | - |
$280
-
MMBtu
|
$758
-
Tgal
|
- | - | |
14 | 2.1336: Install equipment to utilize waste fuel | $12,483 | $61,250 | - | - | - |
$12,483
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $103,792 | $179,427 |
$22,935
370,480
kWh
|
$6,395
-
kW-mo/yr
|
$(-25,395.0)
-
MMBtu
|
$103,106
-
MMBtu
|
$1,516
-
Tgal
|
$(-925.0) | $(-3,840.0) | ||
TOTAL IMPLEMENTED | $50,992 | $62,547 |
$3,050
49,220
kWh
|
$225
-
kW-mo/yr
|
$(-25,395.0)
-
MMBtu
|
$77,877
-
MMBtu
|
- | $(-925.0) | $(-3,840.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #6 Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs