Assessment Year | 2013 |
---|---|
Principal Product | Steel drums |
NAICS | 332439: Other Metal Container Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 62 |
Plant Area |
74,000
ft2
|
Annual Production | 1,300,000
pieces
|
Production Hrs. Annual | 2,375
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $111,289 | 2,219,654 |
kWh
|
$0.050 |
Electricity Demand | $46,720 | 8,347 |
kW-mo/yr
|
$5.60 |
Electricity Fees | $2,321 | - |
|
- |
Natural Gas | $254,464 | 42,137 |
MMBtu
|
$6.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,483 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,824 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2425: Use flue gases to heat process or service water | $13,288 | $25,000 | - | - |
$13,288
-
MMBtu
|
- | - | |
02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $5,220 | $31,024 |
$(-20,347.0)
(-406,125)
kWh
|
$(-7,858.0)
-
kW-mo/yr
|
$33,425
-
MMBtu
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $2,560 | $4,950 | - | - |
$2,560
-
MMBtu
|
- | - | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,591 | $10,980 |
$2,241
44,735
kWh
|
$350
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,248 | $11,314 |
$1,021
20,378
kWh
|
$576
-
kW-mo/yr
|
- | - | $651 | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $576 | $100 |
$714
14,250
kWh
|
$402
-
kW-mo/yr
|
- | $(-300.0) | $(-240.0) | |
TOTAL RECOMMENDED | $26,483 | $83,368 |
$(-16,371.0)
(-326,762)
kWh
|
$(-6,530.0)
-
kW-mo/yr
|
$49,273
-
MMBtu
|
$(-300.0) | $411 | ||
TOTAL IMPLEMENTED | $2,824 | $11,414 |
$1,735
34,628
kWh
|
$978
-
kW-mo/yr
|
- | $(-300.0) | $411 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs