ITAC Assessment: NC0491
ITAC logo
ITAC Assessment: NC0491
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Steel drums
NAICS 332439: Other Metal Container Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 74,000
ft2
Annual Production 1,300,000
pieces
Production Hrs. Annual 2,375
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,289 2,219,654
kWh
Electricity Demand $46,720 8,347
kW-mo/yr
Electricity Fees $2,321 -
Natural Gas $254,464 42,137
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,824

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2425: Use flue gases to heat process or service water $13,288 $25,000 - - $13,288
-
MMBtu
- -
02 2.1321: Replace fossil fuel equipment with electrical equipment $5,220 $31,024 $(-20,347.0)
(-406,125)
kWh
$(-7,858.0)
-
kW-mo/yr
$33,425
-
MMBtu
- -
03 2.2437: Recover waste heat from equipment $2,560 $4,950 - - $2,560
-
MMBtu
- -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $2,591 $10,980 $2,241
44,735
kWh
$350
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,248 $11,314 $1,021
20,378
kWh
$576
-
kW-mo/yr
- - $651
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $576 $100 $714
14,250
kWh
$402
-
kW-mo/yr
- $(-300.0) $(-240.0)
TOTAL RECOMMENDED $26,483 $83,368 $(-16,371.0)
(-326,762)
kWh
$(-6,530.0)
-
kW-mo/yr
$49,273
-
MMBtu
$(-300.0) $411
TOTAL IMPLEMENTED $2,824 $11,414 $1,735
34,628
kWh
$978
-
kW-mo/yr
- $(-300.0) $411
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs