| Assessment Year | 2013 |
|---|---|
| Principal Product | Steel drums |
| NAICS | 332439: Other Metal Container Manufacturing |
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 62 |
| Plant Area |
74,000
ft2
|
| Annual Production | 1,300,000
pieces
|
| Production Hrs. Annual | 2,375
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $111,289 | 2,219,654 |
kWh
|
$0.050 |
| Electricity Demand | $46,720 | 8,347 |
kW-mo/yr
|
$5.60 |
| Electricity Fees | $2,321 | - |
|
- |
| Natural Gas | $254,464 | 42,137 |
MMBtu
|
$6.04 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,483 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,824 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2425: Use flue gases to heat process or service water | $13,288 | $25,000 | - | - |
$13,288
-
MMBtu
|
- | - | |
| 02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $5,220 | $31,024 |
$(-20,347.0)
(-406,125)
kWh
|
$(-7,858.0)
-
kW-mo/yr
|
$33,425
-
MMBtu
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $2,560 | $4,950 | - | - |
$2,560
-
MMBtu
|
- | - | |
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,591 | $10,980 |
$2,241
44,735
kWh
|
$350
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,248 | $11,314 |
$1,021
20,378
kWh
|
$576
-
kW-mo/yr
|
- | - | $651 | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $576 | $100 |
$714
14,250
kWh
|
$402
-
kW-mo/yr
|
- | $(-300.0) | $(-240.0) | |
| TOTAL RECOMMENDED | $26,483 | $83,368 |
$(-16,371.0)
(-326,762)
kWh
|
$(-6,530.0)
-
kW-mo/yr
|
$49,273
-
MMBtu
|
$(-300.0) | $411 | ||
| TOTAL IMPLEMENTED | $2,824 | $11,414 |
$1,735
34,628
kWh
|
$978
-
kW-mo/yr
|
- | $(-300.0) | $411 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs