| Assessment Year | 2013 |
|---|---|
| Principal Product | Automotive stampings |
| NAICS | 336370: Motor Vehicle Metal Stamping |
| SIC | 3465: Automotive Stampings |
| Sales Range | $10 M to 50M |
| # of Employees | 230 |
| Plant Area |
320,000
ft2
|
| Annual Production | 500,000
pieces
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,880,860 | 28,910,400 |
kWh
|
$0.065 |
| Electricity Demand | $220,365 | 69,893 |
kW-mo/yr
|
$3.15 |
| Electricity Fees | $(-66,063.0) | - |
|
- |
| Natural Gas | $48,869 | 4,809 |
MMBtu
|
$10.16 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $174,758 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $157,469 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $156,661 | $530,811 |
$116,429
2,028,378
kWh
|
$12,303
-
kW-mo/yr
|
- | - | $27,929 | |
| 02 | 2.7134: Use photocell controls | $3,519 | $1,000 |
$3,519
61,308
kWh
|
- | - | - | - | |
| 03 | 2.7135: Install occupancy sensors | $1,103 | $971 |
$1,103
19,222
kWh
|
- | - | - | - | |
| 04 | 2.2437: Recover waste heat from equipment | $10,150 | $1,500 | - | - |
$10,150
-
MMBtu
|
- | - | |
| 05 | 2.4131: Size electric motors for peak operating efficiency | $2,517 | $50 |
$2,266
39,480
kWh
|
$251
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $808 | $100 |
$1,484
25,849
kWh
|
$164
-
kW-mo/yr
|
- | $(-600.0) | $(-240.0) | |
| TOTAL RECOMMENDED | $174,758 | $534,432 |
$124,801
2,174,237
kWh
|
$12,718
-
kW-mo/yr
|
$10,150
-
MMBtu
|
$(-600.0) | $27,689 | ||
| TOTAL IMPLEMENTED | $157,469 | $530,911 |
$117,913
2,054,227
kWh
|
$12,467
-
kW-mo/yr
|
- | $(-600.0) | $27,689 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs