ITAC Assessment: NC0489
ITAC logo
ITAC Assessment: NC0489
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Automotive stampings
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 320,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,880,860 28,910,400
kWh
Electricity Demand $220,365 69,893
kW-mo/yr
Electricity Fees $(-66,063.0) -
Natural Gas $48,869 4,809
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $174,758 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $157,469

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $156,661 $530,811 $116,429
2,028,378
kWh
$12,303
-
kW-mo/yr
- - $27,929
02 2.7134: Use photocell controls $3,519 $1,000 $3,519
61,308
kWh
- - - -
03 2.7135: Install occupancy sensors $1,103 $971 $1,103
19,222
kWh
- - - -
04 2.2437: Recover waste heat from equipment $10,150 $1,500 - - $10,150
-
MMBtu
- -
05 2.4131: Size electric motors for peak operating efficiency $2,517 $50 $2,266
39,480
kWh
$251
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $808 $100 $1,484
25,849
kWh
$164
-
kW-mo/yr
- $(-600.0) $(-240.0)
TOTAL RECOMMENDED $174,758 $534,432 $124,801
2,174,237
kWh
$12,718
-
kW-mo/yr
$10,150
-
MMBtu
$(-600.0) $27,689
TOTAL IMPLEMENTED $157,469 $530,911 $117,913
2,054,227
kWh
$12,467
-
kW-mo/yr
- $(-600.0) $27,689
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs