Assessment Year | 2013 |
---|---|
Principal Product | Automotive stampings |
NAICS | 336370: Motor Vehicle Metal Stamping |
SIC | 3465: Automotive Stampings |
Sales Range | $10 M to 50M |
# of Employees | 230 |
Plant Area |
320,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,880,860 | 28,910,400 |
kWh
|
$0.065 |
Electricity Demand | $220,365 | 69,893 |
kW-mo/yr
|
$3.15 |
Electricity Fees | $(-66,063.0) | - |
|
- |
Natural Gas | $48,869 | 4,809 |
MMBtu
|
$10.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $174,758 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $157,469 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $156,661 | $530,811 |
$116,429
2,028,378
kWh
|
$12,303
-
kW-mo/yr
|
- | - | $27,929 | |
02 | 2.7134: Use photocell controls | $3,519 | $1,000 |
$3,519
61,308
kWh
|
- | - | - | - | |
03 | 2.7135: Install occupancy sensors | $1,103 | $971 |
$1,103
19,222
kWh
|
- | - | - | - | |
04 | 2.2437: Recover waste heat from equipment | $10,150 | $1,500 | - | - |
$10,150
-
MMBtu
|
- | - | |
05 | 2.4131: Size electric motors for peak operating efficiency | $2,517 | $50 |
$2,266
39,480
kWh
|
$251
-
kW-mo/yr
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $808 | $100 |
$1,484
25,849
kWh
|
$164
-
kW-mo/yr
|
- | $(-600.0) | $(-240.0) | |
TOTAL RECOMMENDED | $174,758 | $534,432 |
$124,801
2,174,237
kWh
|
$12,718
-
kW-mo/yr
|
$10,150
-
MMBtu
|
$(-600.0) | $27,689 | ||
TOTAL IMPLEMENTED | $157,469 | $530,911 |
$117,913
2,054,227
kWh
|
$12,467
-
kW-mo/yr
|
- | $(-600.0) | $27,689 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs