*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Plastic packaging
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $100
M
to 500
M
# of Employees 252
Plant Area 282,000
ft2
Annual Production 160,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,928,423 58,674,000
kWh
Electricity Demand $1,745,891 94,577
kW-mo/yr
Natural Gas $312,093 43,623
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $267,315 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,256

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,366 $33,811 $6,506
184,262
kWh
$4,860
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $76,174 $132,415 $44,473
1,259,496
kWh
$33,215
-
kW-mo/yr
- - $(-1,514.0)
03 2.7135: Install occupancy sensors $5,539 $2,682 $5,539
156,878
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,981 $2,248 $477
13,520
kWh
$343
-
kW-mo/yr
- - $1,161
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $139,540 $300,000 $169,064
4,788,000
kWh
$126,267
-
kW-mo/yr
$(-155,791.0)
-
MMBtu
- -
06 2.2437: Recover waste heat from equipment $11,303 $4,000 $(-99.0)
(-2,800)
kWh
$(-74.0)
-
kW-mo/yr
$11,476
-
MMBtu
- -
07 2.2426: Use waste heat from flue gases to heat space conditioning air $14,522 $24,104 $(-204.0)
(-5,789)
kWh
$(-139.0)
-
kW-mo/yr
$14,865
-
MMBtu
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,890 $100 $4,425
125,328
kWh
$3,305
-
kW-mo/yr
- $(-600.0) $(-240.0)
TOTAL RECOMMENDED $267,315 $499,360 $230,181
6,518,895
kWh
$167,777
-
kW-mo/yr
$(-129,450.0)
-
MMBtu
$(-600.0) $(-593.0)
TOTAL IMPLEMENTED $18,256 $33,911 $10,931
309,590
kWh
$8,165
-
kW-mo/yr
- $(-600.0) $(-240.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs