ITAC Assessment: NC0471
ITAC logo
ITAC Assessment: NC0471
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Cigarettes
NAICS 312230: Tobacco Manufacturing
SIC 2111: Cigarettes
Sales Range greater than $500
M
# of Employees 1,200
Plant Area 1,180,613
ft2
Annual Production 38,000,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,495,028 62,836,400
kWh
Electricity Demand $1,054,554 123,168
kW-mo/yr
Electricity Fees $6,619 -
Natural Gas $1,648,438 272,920
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $398,193 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $212,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $50,793 $243,606 $40,042
1,001,040
kWh
$10,751
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $90,894 $148,184 $73,388
1,834,694
kWh
$19,701
-
kW-mo/yr
- - - $(-2,195.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,310 $2,810 $676
16,900
kWh
$182
-
kW-mo/yr
- - - $1,452
04 2.7135: Install occupancy sensors $17,141 $6,600 $17,141
428,523
kWh
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,566 $100 $5,489
137,234
kWh
$1,477
-
kW-mo/yr
- - $(-1,200.0) $(-1,200.0)
06 2.1233: Analyze flue gas for proper air/fuel ratio $121,439 $199,600 - - $121,439
-
MMBtu
- - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $5,568 $2,700 - - $5,568
-
MMBtu
- - -
08 2.2121: Increase amount of condensate returned $22,095 $21,000 - - $11,231
-
MMBtu
$10,364
-
Tgal
- $500
09 2.2113: Repair or replace steam traps $19,533 $16,000 - - $19,533
-
MMBtu
- - -
10 2.7242: Change zone reheat coils to variable air volume boxes $63,854 $140,000 $12,836
369,542
kWh
- $51,018
-
MMBtu
- - -
TOTAL RECOMMENDED $398,193 $780,600 $149,572
3,787,933
kWh
$32,111
-
kW-mo/yr
$208,789
-
MMBtu
$10,364
-
Tgal
$(-1,200.0) $(-1,443.0)
TOTAL IMPLEMENTED $212,900 $441,000 $136,736
3,418,391
kWh
$32,111
-
kW-mo/yr
$36,332
-
MMBtu
$10,364
-
Tgal
$(-1,200.0) $(-1,443.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs