Assessment Year | 2012 |
---|---|
Principal Product | Cigarette packing machines |
NAICS | 333249: Other Industrial Machinery Manufacturing |
SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 164 |
Plant Area |
123,000
ft2
|
Annual Production | 10
pieces
|
Production Hrs. Annual | 3,500
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $111,736 | 1,431,136 |
kWh
|
$0.078 |
Electricity Demand | $23,220 | 5,077 |
kW-mo/yr
|
$4.57 |
Electricity Fees | $4,614 | - |
|
- |
Natural Gas | $30,880 | 2,380 |
MMBtu
|
$12.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,357 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,235 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $146 | $652 |
$121
1,544
kWh
|
$24
-
kW-mo/yr
|
- | $1 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $290 | $1,265 |
$144
1,840
kWh
|
$101
-
kW-mo/yr
|
- | $45 | |
03 | 2.7144: Install spectral reflectors / delamp | $3,485 | $18,400 |
$2,321
29,722
kWh
|
$1,164
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,208 | $1,180 |
$554
7,098
kWh
|
$45
-
kW-mo/yr
|
- | $609 | |
05 | 2.7135: Install occupancy sensors | $448 | $525 |
$448
5,744
kWh
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $347 | $1,200 | - | - |
$347
-
MMBtu
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $245 | $100 |
$204
2,611
kWh
|
$41
-
kW-mo/yr
|
- | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $459 | $300 |
$406
5,200
kWh
|
$53
-
kW-mo/yr
|
- | - | |
09 | 2.7224: Reduce space conditioning during non-working hours | $34,729 | $15,000 |
$24,209
310,059
kWh
|
$(-974.0)
-
kW-mo/yr
|
$11,494
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $41,357 | $38,622 |
$28,407
363,818
kWh
|
$454
-
kW-mo/yr
|
$11,841
-
MMBtu
|
$655 | ||
TOTAL IMPLEMENTED | $37,235 | $17,757 |
$25,942
332,256
kWh
|
$(-811.0)
-
kW-mo/yr
|
$11,494
-
MMBtu
|
$610 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs