Assessment Year | 2012 |
---|---|
Principal Product | Shampoos and deodorants |
NAICS | 325620: Toilet Preparation Manufacturing |
SIC | 2844: Perfumes, Cosmetics, and Other Toilet Preparations |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
550,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,154,357 | 19,940,560 |
kWh
|
$0.058 |
Electricity Demand | $1,373,289 | 164,269 |
kW-mo/yr
|
$8.36 |
Natural Gas | $175,479 | 33,922 |
MMBtu
|
$5.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $140,111 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $95,008 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $87,056 | $77,718 |
$73,553
1,143,198
kWh
|
$13,092
-
kW-mo/yr
|
- | $411 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,873 | $35,445 |
$5,453
84,751
kWh
|
$2,420
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $79 | $110 |
$10
160
kWh
|
$62
-
kW-mo/yr
|
- | $7 | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $42,271 | $58,000 |
$42,271
657,000
kWh
|
- | - | - | |
05 | 2.5194: Redesign process | $2,832 | $1,000 |
$4,822
74,952
kWh
|
$843
-
kW-mo/yr
|
$(-2,833.0) | - | |
TOTAL RECOMMENDED | $140,111 | $172,273 |
$126,109
1,960,061
kWh
|
$16,417
-
kW-mo/yr
|
$(-2,833.0) | $418 | ||
TOTAL IMPLEMENTED | $95,008 | $113,273 |
$79,016
1,228,109
kWh
|
$15,574
-
kW-mo/yr
|
- | $418 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs