ITAC Assessment: NC0464
ITAC logo
ITAC Assessment: NC0464
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Shampoos and deodorants
NAICS 325620: Toilet Preparation Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 550,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,154,357 19,940,560
kWh
Electricity Demand $1,373,289 164,269
kW-mo/yr
Natural Gas $175,479 33,922
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $140,111 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,008

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $87,056 $77,718 $73,553
1,143,198
kWh
$13,092
-
kW-mo/yr
- $411
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,873 $35,445 $5,453
84,751
kWh
$2,420
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $79 $110 $10
160
kWh
$62
-
kW-mo/yr
- $7
04 2.2614: Use cooling tower or economizer to replace chiller cooling $42,271 $58,000 $42,271
657,000
kWh
- - -
05 2.5194: Redesign process $2,832 $1,000 $4,822
74,952
kWh
$843
-
kW-mo/yr
$(-2,833.0) -
TOTAL RECOMMENDED $140,111 $172,273 $126,109
1,960,061
kWh
$16,417
-
kW-mo/yr
$(-2,833.0) $418
TOTAL IMPLEMENTED $95,008 $113,273 $79,016
1,228,109
kWh
$15,574
-
kW-mo/yr
- $418
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs