ITAC Assessment: MI0235
ITAC logo
ITAC Assessment: MI0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Essential Oils
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 76,500
ft2
Annual Production 4,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,218 1,729,121
kWh
Electricity Demand $14,349 4,096
kW-mo/yr
Electricity Fees $52,256 -
Natural Gas $30,707 11,053
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,249 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $6,472 $18,000 - - $6,472
-
MMBtu
02 2.6218: Turn off equipment when not in use $13,438 $1,800 $12,538
187,138
kWh
$900
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,094 $13,735 $8,264
123,334
kWh
$830
-
kW-mo/yr
-
04 2.2447: Heat water with exhaust heat $4,126 $14,000 - - $4,126
-
MMBtu
05 2.1243: Use heat from boiler blowdown to preheat boiler feed water $5,349 $1,400 - - $5,349
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,581 $1,660 $2,259
33,723
kWh
$322
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $2,562 $900 $2,327
34,724
kWh
$235
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,298 $80 $1,130
16,863
kWh
$168
-
kW-mo/yr
-
09 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,188 $40 $988
14,751
kWh
$200
-
kW-mo/yr
-
10 2.1233: Analyze flue gas for proper air/fuel ratio $992 $2,520 - - $992
-
MMBtu
11 2.7142: Utilize higher efficiency lamps and/or ballasts $942 $2,050 $784
11,716
kWh
$158
-
kW-mo/yr
-
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $855 $660 $778
11,638
kWh
$77
-
kW-mo/yr
-
13 2.7145: Install skylights $704 $1,200 $585
8,736
kWh
$119
-
kW-mo/yr
-
14 2.6127: Maintain air filters by cleaning or replacement $648 $693 $589
8,798
kWh
$59
-
kW-mo/yr
-
TOTAL RECOMMENDED $50,249 $58,738 $30,242
451,421
kWh
$3,068
-
kW-mo/yr
$16,939
-
MMBtu
TOTAL IMPLEMENTED $37,150 $22,828 $28,095
419,331
kWh
$2,714
-
kW-mo/yr
$6,341
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings