Assessment Year | 2013 |
---|---|
Principal Product | Essential Oils |
NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
76,500
ft2
|
Annual Production | 4,000,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $115,218 | 1,729,121 |
kWh
|
$0.067 |
Electricity Demand | $14,349 | 4,096 |
kW-mo/yr
|
$3.50 |
Electricity Fees | $52,256 | - |
|
- |
Natural Gas | $30,707 | 11,053 |
MMBtu
|
$2.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,249 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,150 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $6,472 | $18,000 | - | - |
$6,472
-
MMBtu
|
|
02 | 2.6218: Turn off equipment when not in use | $13,438 | $1,800 |
$12,538
187,138
kWh
|
$900
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,094 | $13,735 |
$8,264
123,334
kWh
|
$830
-
kW-mo/yr
|
- | |
04 | 2.2447: Heat water with exhaust heat | $4,126 | $14,000 | - | - |
$4,126
-
MMBtu
|
|
05 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $5,349 | $1,400 | - | - |
$5,349
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,581 | $1,660 |
$2,259
33,723
kWh
|
$322
-
kW-mo/yr
|
- | |
07 | 2.7135: Install occupancy sensors | $2,562 | $900 |
$2,327
34,724
kWh
|
$235
-
kW-mo/yr
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,298 | $80 |
$1,130
16,863
kWh
|
$168
-
kW-mo/yr
|
- | |
09 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,188 | $40 |
$988
14,751
kWh
|
$200
-
kW-mo/yr
|
- | |
10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $992 | $2,520 | - | - |
$992
-
MMBtu
|
|
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $942 | $2,050 |
$784
11,716
kWh
|
$158
-
kW-mo/yr
|
- | |
12 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $855 | $660 |
$778
11,638
kWh
|
$77
-
kW-mo/yr
|
- | |
13 | 2.7145: Install skylights | $704 | $1,200 |
$585
8,736
kWh
|
$119
-
kW-mo/yr
|
- | |
14 | 2.6127: Maintain air filters by cleaning or replacement | $648 | $693 |
$589
8,798
kWh
|
$59
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $50,249 | $58,738 |
$30,242
451,421
kWh
|
$3,068
-
kW-mo/yr
|
$16,939
-
MMBtu
|
||
TOTAL IMPLEMENTED | $37,150 | $22,828 |
$28,095
419,331
kWh
|
$2,714
-
kW-mo/yr
|
$6,341
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs