ITAC Assessment: NC0458
ITAC logo
ITAC Assessment: NC0458
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Farm equipment
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 165,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,347 2,800,429
kWh
Electricity Demand $65,341 11,084
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $502,725 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $221,812

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $453 $100 $1,139
16,409
kWh
$154
-
kW-mo/yr
$(-600.0) $(-240.0) -
02 2.4239: Eliminate or reduce compressed air usage $1,650 $1,040 $1,241
17,882
kWh
$409
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,851 $26,563 $4,481
85,345
kWh
$1,370
-
kW-mo/yr
- - -
04 2.6218: Turn off equipment when not in use $3,659 $441 $3,659
52,714
kWh
- - - -
05 2.7134: Use photocell controls $169 $250 $169
2,436
kWh
- - - -
06 4.424: Improve space comfort conditioning $83,263 $35,225 $(-3,997.0)
(-57,000)
kWh
$(-587.0)
-
kW-mo/yr
- - $87,847
07 4.431: Train operators for maximum operating efficiency $196,000 $25,000 - - $196,000 - -
08 4.513: Re-arrange equipment layout to reduce labor costs $211,680 $48,800 - - $211,680 - -
TOTAL RECOMMENDED $502,725 $137,419 $6,692
117,786
kWh
$1,346
-
kW-mo/yr
$407,080 $(-240.0) $87,847
TOTAL IMPLEMENTED $221,812 $76,154 $9,448
156,904
kWh
$1,524
-
kW-mo/yr
$211,080 $(-240.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs