ITAC Assessment: NC0454
ITAC logo
ITAC Assessment: NC0454
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Museum
NAICS 712110: Museums
SIC 8412: Museums and Art Galleries
Sales Range less than $500
k
# of Employees 25
Plant Area 12,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,074 1,255,200
kWh
Electricity Demand $23,506 2,816
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,838 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,353

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,289 $5,115 $1,128
21,727
kWh
$495
-
kW-mo/yr
$1,666 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,774 $900 $876
16,878
kWh
$471
-
kW-mo/yr
$427 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,836 $175 $1,276
24,592
kWh
$560
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $454 $225 $158
3,043
kWh
$35
-
kW-mo/yr
$261 -
05 2.7135: Install occupancy sensors $134 $529 $134
2,587
kWh
- - -
06 2.7232: Replace existing hvac unit with high efficiency model $3,318 $15,000 $1,691
35,602
kWh
$1,627
-
kW-mo/yr
- -
07 4.424: Improve space comfort conditioning $41,033 $60,000 $(-3,114.0)
(-60,006)
kWh
$(-853.0)
-
kW-mo/yr
- $45,000
TOTAL RECOMMENDED $51,838 $81,944 $2,149
44,423
kWh
$2,335
-
kW-mo/yr
$2,354 $45,000
TOTAL IMPLEMENTED $7,353 $6,415 $3,438
66,240
kWh
$1,561
-
kW-mo/yr
$2,354 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs