ITAC Assessment: NC0451
ITAC logo
ITAC Assessment: NC0451
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Solid rubber wheels
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 53,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,173 2,247,300
kWh
Electricity Demand $39,665 4,220
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,790 $14,320 $4,404
129,948
kWh
$1,771
-
kW-mo/yr
- $(-385.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $444 $1,674 $190
5,618
kWh
$254
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $252 $533 $252
7,433
kWh
- - -
04 2.2623: Minimize condenser cooling water temperature $2,656 $1,800 $2,628
77,550
kWh
$1,086
-
kW-mo/yr
$(-1,058.0)
-
Tgal
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,516 $4,075 $845
24,929
kWh
$671
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $158 $100 $185
5,460
kWh
$73
-
kW-mo/yr
- $(-100.0)
TOTAL RECOMMENDED $10,816 $22,502 $8,504
250,938
kWh
$3,855
-
kW-mo/yr
$(-1,058.0)
-
Tgal
$(-485.0)
TOTAL IMPLEMENTED $8,160 $20,702 $5,876
173,388
kWh
$2,769
-
kW-mo/yr
- $(-485.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs