ITAC Assessment: KG0042
ITAC logo
ITAC Assessment: KG0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Custom Welding ,Cutting and Bending
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 150,000
ft2
Annual Production 1,200
ton
Production Hrs. Annual 2,600
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,370 643,611
kWh
Natural Gas $210 85
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,886 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,021

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $6,779 $10,990 $6,779
83,822
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,293 $160 $5,293
43,376
kWh
03 2.4314: Use synthetic lubricant $2,596 - $2,596
21,395
kWh
04 2.7261: Install timers and/or thermostats $1,424 $300 $1,424
24,912
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,086 $2,408 $1,086
8,792
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $708 $153 $708
5,862
kWh
TOTAL RECOMMENDED $17,886 $14,011 $17,886
188,159
kWh
TOTAL IMPLEMENTED $10,021 $613 $10,021
95,545
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs