ITAC Assessment: NC0418
ITAC logo
ITAC Assessment: NC0418
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Medium voltage transformers
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 162,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $516,716 7,191,600
kWh
Electricity Demand $355,867 16,399
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $304,682 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,198

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $244,640 $566,702 $3,443
47,780
kWh
$284,134
-
kW-mo/yr
$(-42,937.0)
-
MMBtu
- - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $30,535 $5,000 - $31,135
-
kW-mo/yr
- $(-600.0) - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $20,540 $37,837 $9,587
133,424
kWh
$10,853
-
kW-mo/yr
- - $100 -
04 2.7135: Install occupancy sensors $202 $600 $202
2,816
kWh
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,663 $100 $1,681
23,400
kWh
$1,822
-
kW-mo/yr
- $(-600.0) - $(-240.0)
06 2.2511: Insulate bare equipment $133 $567 $133
1,852
kWh
- - - - -
07 4.212: Adopt in-house material generation $5,969 $25,000 $(-2,694.0)
(-37,495)
kWh
$(-3,059.0)
-
kW-mo/yr
- - $(-1,200.0) $12,922
TOTAL RECOMMENDED $304,682 $635,806 $12,352
171,777
kWh
$324,885
-
kW-mo/yr
$(-42,937.0)
-
MMBtu
$(-1,200.0) $(-1,100.0) $12,682
TOTAL IMPLEMENTED $33,198 $5,100 $1,681
23,400
kWh
$32,957
-
kW-mo/yr
- $(-1,200.0) - $(-240.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs