ITAC Assessment: CO0166
ITAC logo
ITAC Assessment: CO0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product SOFT COVER TEXTBOOKS
NAICS
n/a
SIC 2732: Book Printing
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,979 1,606,975
kWh
Natural Gas $10,785 2,653
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,620 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $4,860 $250 $4,350
-
kWh
$510
-
MMBtu
02 2.3212: Optimize plant power factor $3,760 $3,900 $3,760
-
kWh
-
03 2.1123: Install automatic stack damper $2,050 $4,000 - $2,050
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,280 $4,130 $1,280
27,257
kWh
-
05 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $800 $600 $800
30,774
kWh
-
06 2.7111: Reduce illumination to minimum necessary levels $440 $200 $440
9,086
kWh
-
07 2.2623: Minimize condenser cooling water temperature $430 $100 $430
8,499
kWh
-
TOTAL RECOMMENDED $13,620 $13,180 $11,060
75,616
kWh
$2,560
-
MMBtu
TOTAL IMPLEMENTED $11,900 $8,850 $9,340
39,273
kWh
$2,560
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs