| Assessment Year | 2010 |
|---|---|
| Principal Product | Perlite |
| NAICS | 327992: Ground or Treated Mineral and Earth Manufacturing |
| SIC | 3295: Minerals and Earths, Ground or Otherwise Treated |
| Sales Range | $5 M to 10M |
| # of Employees | 10 |
| Plant Area |
8,275
ft2
|
| Annual Production | 24,000,000
lb
|
| Production Hrs. Annual | 4,800
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $57,778 | 820,000 |
kWh
|
$0.070 |
| Electricity Demand | $12,034 | 2,461 |
kW-mo/yr
|
$4.89 |
| Electricity Fees | $2,459 | - |
|
- |
| Natural Gas | $168,946 | 33,826 |
MMBtu
|
$4.99 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,976 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,008 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $11,924 | $26,000 | - | - |
$11,924
-
MMBtu
|
- | - | |
| 02 | 2.4151: Develop a repair/replace policy | $1,188 | $1,991 |
$1,012
14,398
kWh
|
$176
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.6218: Turn off equipment when not in use | $1,044 | $680 |
$1,044
14,850
kWh
|
- | - | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,335 | $50 |
$1,137
16,176
kWh
|
$198
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $305 | $100 |
$566
8,057
kWh
|
$99
-
kW-mo/yr
|
- | $(-300.0) | $(-60.0) | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $556 | $1,692 |
$525
7,462
kWh
|
$91
-
kW-mo/yr
|
- | $(-82.0) | $22 | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $488 | $562 |
$326
4,631
kWh
|
$81
-
kW-mo/yr
|
- | - | $81 | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $868 | $1,450 |
$790
11,232
kWh
|
$78
-
kW-mo/yr
|
- | - | - | |
| 09 | 2.7135: Install occupancy sensors | $268 | $499 |
$268
3,807
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $17,976 | $33,024 |
$5,668
80,613
kWh
|
$723
-
kW-mo/yr
|
$11,924
-
MMBtu
|
$(-382.0) | $43 | ||
| TOTAL IMPLEMENTED | $5,008 | $6,344 |
$4,624
65,763
kWh
|
$723
-
kW-mo/yr
|
- | $(-382.0) | $43 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs