Assessment Year | 2010 |
---|---|
Principal Product | Ready to assemble furniture |
NAICS | 337122: Nonupholstered Wood Household Furniture Manufacturing |
SIC | 2511: Wood Household Furniture, Except Upholstered |
Sales Range | $50 M to 100M |
# of Employees | 289 |
Plant Area |
960,000
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,200,576 | 23,875,200 |
kWh
|
$0.050 |
Electricity Demand | $667,285 | 58,025 |
kW-mo/yr
|
$11.50 |
Natural Gas | $142,844 | 14,120 |
MMBtu
|
$10.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,348,646 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,690 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $1,310,487 | - |
$473,827
9,403,200
kWh
|
$180,228
-
kW-mo/yr
|
- |
$672,000
-
lb
|
- | - |
$(-15,568.0)
-
Tgal
|
|
02 | 2.7243: Improve air circulation with destratification fans / other methods | $24,409 | - |
$(-6,603.0)
(-131,040)
kWh
|
$(-2,070.0)
-
kW-mo/yr
|
$33,082
-
MMBtu
|
- | - | - | - | |
03 | 2.6218: Turn off equipment when not in use | $6,060 | $2,000 |
$6,060
120,257
kWh
|
- | - | - | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,500 | $400 |
$6,322
125,471
kWh
|
$1,978
-
kW-mo/yr
|
- | - | $(-1,200.0) | $(-600.0) | - | |
05 | 2.7135: Install occupancy sensors | $1,190 | $1,500 |
$1,190
27,857
kWh
|
- | - | - | - | - | - | |
TOTAL RECOMMENDED | $1,348,646 | $3,900 |
$480,796
9,545,745
kWh
|
$180,136
-
kW-mo/yr
|
$33,082
-
MMBtu
|
$672,000
-
lb
|
$(-1,200.0) | $(-600.0) |
$(-15,568.0)
-
Tgal
|
||
TOTAL IMPLEMENTED | $7,690 | $1,900 |
$7,512
153,328
kWh
|
$1,978
-
kW-mo/yr
|
- | - | $(-1,200.0) | $(-600.0) | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs