ITAC Assessment: NC0403
ITAC logo
ITAC Assessment: NC0403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Ready to assemble furniture
NAICS 337122: Nonupholstered Wood Household Furniture Manufacturing
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $50
M
to 100
M
# of Employees 289
Plant Area 960,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,200,576 23,875,200
kWh
Electricity Demand $667,285 58,025
kW-mo/yr
Natural Gas $142,844 14,120
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,348,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,690

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $1,310,487 - $473,827
9,403,200
kWh
$180,228
-
kW-mo/yr
- $672,000
-
lb
- - $(-15,568.0)
-
Tgal
02 2.7243: Improve air circulation with destratification fans / other methods $24,409 - $(-6,603.0)
(-131,040)
kWh
$(-2,070.0)
-
kW-mo/yr
$33,082
-
MMBtu
- - - -
03 2.6218: Turn off equipment when not in use $6,060 $2,000 $6,060
120,257
kWh
- - - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,500 $400 $6,322
125,471
kWh
$1,978
-
kW-mo/yr
- - $(-1,200.0) $(-600.0) -
05 2.7135: Install occupancy sensors $1,190 $1,500 $1,190
27,857
kWh
- - - - - -
TOTAL RECOMMENDED $1,348,646 $3,900 $480,796
9,545,745
kWh
$180,136
-
kW-mo/yr
$33,082
-
MMBtu
$672,000
-
lb
$(-1,200.0) $(-600.0) $(-15,568.0)
-
Tgal
TOTAL IMPLEMENTED $7,690 $1,900 $7,512
153,328
kWh
$1,978
-
kW-mo/yr
- - $(-1,200.0) $(-600.0) -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs