Assessment Year | 2010 |
---|---|
Principal Product | Magnet wire |
NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
56,500
ft2
|
Annual Production | 6,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $129,024 | 1,362,800 |
kWh
|
$0.095 |
Electricity Demand | $83,407 | 6,762 |
kW-mo/yr
|
$12.33 |
Electricity Fees | $3,348 | - |
|
- |
Natural Gas | $3,348 | 300 |
MMBtu
|
$11.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,579 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,203 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4237: Substitute compressed air cooling with water or air cooling | $12,960 | $17,280 |
$8,799
213,043
kWh
|
$4,161
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.2437: Recover waste heat from equipment | $712 | $1,000 |
$(-521.0)
(-12,622)
kWh
|
$(-247.0)
-
kW-mo/yr
|
$1,413
-
MMBtu
|
- | - |
$67
-
Tgal
|
|
03 | 2.2511: Insulate bare equipment | $1,212 | $3,660 |
$823
79,668
kWh
|
$389
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $492 | $751 |
$331
8,019
kWh
|
$161
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,804 | $12,206 |
$3,213
77,789
kWh
|
$1,522
-
kW-mo/yr
|
- | $(-877.0) | $946 | - | |
06 | 2.7135: Install occupancy sensors | $399 | $100 |
$399
9,650
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $20,579 | $34,997 |
$13,044
375,547
kWh
|
$5,986
-
kW-mo/yr
|
$1,413
-
MMBtu
|
$(-877.0) | $946 |
$67
-
Tgal
|
||
TOTAL IMPLEMENTED | $5,203 | $12,306 |
$3,612
87,439
kWh
|
$1,522
-
kW-mo/yr
|
- | $(-877.0) | $946 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs