ITAC Assessment: NC0373
ITAC logo
ITAC Assessment: NC0373
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Dental equipment
NAICS 339114: Dental Equipment and Supplies Manufacturing
SIC 3843: Dental Equipment and Supplies
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 169,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,564 4,926,800
kWh
Electricity Demand $95,639 9,918
kW-mo/yr
Electricity Fees $7,670 -
Natural Gas $140,228 12,332
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,522 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,168

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7241: Install outside air damper / economizer on hvac unit $4,343 $15,000 $4,343
125,311
kWh
- - -
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $13,018 $26,250 $3,992
115,161
kWh
$9,026
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $650 $100 $1,053
30,390
kWh
$397
-
kW-mo/yr
$(-400.0) $(-400.0)
04 2.2437: Recover waste heat from equipment $4,993 $16,000 $4,057
117,052
kWh
$936
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,639 $5,398 $2,920
84,250
kWh
$1,719
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,879 $9,158 $1,865
53,808
kWh
$1,014
-
kW-mo/yr
- -
TOTAL RECOMMENDED $30,522 $71,906 $18,230
525,972
kWh
$13,092
-
kW-mo/yr
$(-400.0) $(-400.0)
TOTAL IMPLEMENTED $8,168 $14,656 $5,838
168,448
kWh
$3,130
-
kW-mo/yr
$(-400.0) $(-400.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs