ITAC Assessment: NC0370
ITAC logo
ITAC Assessment: NC0370
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Blood based pharmaceuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range greater than $500
M
# of Employees 2,000
Plant Area 1,000,000
ft2
Annual Production 529
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,159,558 87,519,065
kWh
Electricity Demand $2,253,277 145,683
kW-mo/yr
Electricity Fees $173,593 -
Natural Gas $2,789,023 343,946
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $423,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.1133: Adjust burners for efficient operation $30,975 $65,000 - - $30,975
-
MMBtu
- -
02 2.2113: Repair or replace steam traps $43,809 $17,100 - - $42,626
-
MMBtu
- $1,183
-
Tgal
03 2.1243: Use heat from boiler blowdown to preheat boiler feed water $48,420 $25,000 - - $48,310
-
MMBtu
- $110
-
Tgal
04 2.2437: Recover waste heat from equipment $27,567 $74,816 - - $27,567
-
MMBtu
- -
05 2.2437: Recover waste heat from equipment $45,052 $88,200 $(-18,152.0)
(-502,824)
kWh
$(-9,657.0)
-
kW-mo/yr
$72,861
-
MMBtu
- -
06 3.4151: Minimize water usage $74,891 $121,780 $(-2,596.0)
(-71,920)
kWh
$(-1,381.0)
-
kW-mo/yr
- $66,415 $12,453
-
Tgal
07 2.2437: Recover waste heat from equipment $87,257 $136,000 $(-12,682.0)
(-351,300)
kWh
$(-6,746.0)
-
kW-mo/yr
$106,685
-
MMBtu
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $48,768 $120,500 $37,316
1,033,680
kWh
$19,852
-
kW-mo/yr
- $(-8,400.0) -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $9,690 $50 $6,325
175,200
kWh
$3,365
-
kW-mo/yr
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $6,644 $7,240 $4,337
120,137
kWh
$2,307
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $423,073 $655,686 $14,548
402,973
kWh
$7,740
-
kW-mo/yr
$329,024
-
MMBtu
$58,015 $13,746
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs