Assessment Year | 2007 |
---|---|
Principal Product | Blood based pharmaceuticals |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | greater than $500 M |
# of Employees | 2,000 |
Plant Area |
1,000,000
ft2
|
Annual Production | 529
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $3,159,558 | 87,519,065 |
kWh
|
$0.036 |
Electricity Demand | $2,253,277 | 145,683 |
kW-mo/yr
|
$15.47 |
Electricity Fees | $173,593 | - |
|
- |
Natural Gas | $2,789,023 | 343,946 |
MMBtu
|
$8.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $423,073 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1133: Adjust burners for efficient operation | $30,975 | $65,000 | - | - |
$30,975
-
MMBtu
|
- | - | |
02 | 2.2113: Repair or replace steam traps | $43,809 | $17,100 | - | - |
$42,626
-
MMBtu
|
- |
$1,183
-
Tgal
|
|
03 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $48,420 | $25,000 | - | - |
$48,310
-
MMBtu
|
- |
$110
-
Tgal
|
|
04 | 2.2437: Recover waste heat from equipment | $27,567 | $74,816 | - | - |
$27,567
-
MMBtu
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $45,052 | $88,200 |
$(-18,152.0)
(-502,824)
kWh
|
$(-9,657.0)
-
kW-mo/yr
|
$72,861
-
MMBtu
|
- | - | |
06 | 3.4151: Minimize water usage | $74,891 | $121,780 |
$(-2,596.0)
(-71,920)
kWh
|
$(-1,381.0)
-
kW-mo/yr
|
- | $66,415 |
$12,453
-
Tgal
|
|
07 | 2.2437: Recover waste heat from equipment | $87,257 | $136,000 |
$(-12,682.0)
(-351,300)
kWh
|
$(-6,746.0)
-
kW-mo/yr
|
$106,685
-
MMBtu
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $48,768 | $120,500 |
$37,316
1,033,680
kWh
|
$19,852
-
kW-mo/yr
|
- | $(-8,400.0) | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,690 | $50 |
$6,325
175,200
kWh
|
$3,365
-
kW-mo/yr
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,644 | $7,240 |
$4,337
120,137
kWh
|
$2,307
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $423,073 | $655,686 |
$14,548
402,973
kWh
|
$7,740
-
kW-mo/yr
|
$329,024
-
MMBtu
|
$58,015 |
$13,746
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs