ITAC Assessment: NC0350
ITAC logo
ITAC Assessment: NC0350
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Monomers and oligomers
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 61,716
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $349,830 11,051,640
kWh
Electricity Demand $180,045 18,330
kW-mo/yr
Electricity Fees $11,720 -
Natural Gas $902,972 89,466
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $163,869 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,605

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $122,745 $114,000 - - $122,745
-
MMBtu
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,138 $10,500 $11,050
272,160
kWh
$2,088
-
kW-mo/yr
- - -
03 2.2515: Use optimum thickness insulation $12,275 $1,000 - - $12,275
-
MMBtu
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $15,381 $2,000 - - $15,381
-
MMBtu
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $330 $100 $652
29,652
kWh
$578
-
kW-mo/yr
- $(-600.0) $(-300.0)
TOTAL RECOMMENDED $163,869 $127,600 $11,702
301,812
kWh
$2,666
-
kW-mo/yr
$150,401
-
MMBtu
$(-600.0) $(-300.0)
TOTAL IMPLEMENTED $12,605 $1,100 $652
29,652
kWh
$578
-
kW-mo/yr
$12,275
-
MMBtu
$(-600.0) $(-300.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs