Assessment Year | 2006 |
---|---|
Principal Product | Monomers and oligomers |
NAICS | 325199: All Other Basic Organic Chemical Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
61,716
ft2
|
Annual Production | 30,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $349,830 | 11,051,640 |
kWh
|
$0.032 |
Electricity Demand | $180,045 | 18,330 |
kW-mo/yr
|
$9.82 |
Electricity Fees | $11,720 | - |
|
- |
Natural Gas | $902,972 | 89,466 |
MMBtu
|
$10.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $163,869 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,605 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $122,745 | $114,000 | - | - |
$122,745
-
MMBtu
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,138 | $10,500 |
$11,050
272,160
kWh
|
$2,088
-
kW-mo/yr
|
- | - | - | |
03 | 2.2515: Use optimum thickness insulation | $12,275 | $1,000 | - | - |
$12,275
-
MMBtu
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $15,381 | $2,000 | - | - |
$15,381
-
MMBtu
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $330 | $100 |
$652
29,652
kWh
|
$578
-
kW-mo/yr
|
- | $(-600.0) | $(-300.0) | |
TOTAL RECOMMENDED | $163,869 | $127,600 |
$11,702
301,812
kWh
|
$2,666
-
kW-mo/yr
|
$150,401
-
MMBtu
|
$(-600.0) | $(-300.0) | ||
TOTAL IMPLEMENTED | $12,605 | $1,100 |
$652
29,652
kWh
|
$578
-
kW-mo/yr
|
$12,275
-
MMBtu
|
$(-600.0) | $(-300.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs