| Assessment Year | 2006 |
|---|---|
| Principal Product | Tires |
| NAICS | 326211: Tire Manufacturing (except Retreading) |
| SIC | 3010: |
| Sales Range | $100 M to 500M |
| # of Employees | 900 |
| Plant Area |
1,000,000
ft2
|
| Annual Production | 5,600,000
pieces
|
| Production Hrs. Annual | 8,000
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,434,751 | 85,344,000 |
kWh
|
$0.017 |
| Electricity Demand | $1,140,840 | 136,404 |
kW-mo/yr
|
$8.36 |
| Electricity Fees | $68,429 | - |
|
- |
| Natural Gas | $3,166,375 | 306,741 |
MMBtu
|
$10.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,128,363 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $161,105 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2113: Repair or replace steam traps | $227,235 | $231,600 | - | - |
$233,317
-
MMBtu
|
- | $(-10,000.0) | - |
$3,918
-
Tgal
|
|
| 02 | 2.6213: Turn off steam / hot water lines leading to space heating units | $675,393 | $100,000 | - | - |
$675,393
-
MMBtu
|
- | - | - | - | |
| 03 | 2.2135: Repair and eliminate steam leaks | $41,056 | $10,000 | - | - |
$42,365
-
MMBtu
|
$(-2,000.0) | - | - |
$691
-
Tgal
|
|
| 04 | 2.2121: Increase amount of condensate returned | $93,691 | $100,000 | - | - |
$86,267
-
MMBtu
|
- | - | - |
$7,424
-
Tgal
|
|
| 05 | 2.2136: Install / repair insulation on steam lines | $64,630 | $11,200 | - | - |
$64,630
-
MMBtu
|
- | - | - | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,853 | $20,000 |
$16,056
783,200
kWh
|
$9,797
-
kW-mo/yr
|
- | $(-10,000.0) | $(-6,000.0) | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,136 | $1,407 |
$707
34,498
kWh
|
$429
-
kW-mo/yr
|
- | - | - | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,369 | $50 |
$7,818
381,440
kWh
|
$4,770
-
kW-mo/yr
|
- | - | - | $2,781 | - | |
| TOTAL RECOMMENDED | $1,128,363 | $474,257 |
$24,581
1,199,138
kWh
|
$14,996
-
kW-mo/yr
|
$1,101,972
-
MMBtu
|
$(-12,000.0) | $(-16,000.0) | $2,781 |
$12,033
-
Tgal
|
||
| TOTAL IMPLEMENTED | $161,105 | $131,457 |
$24,581
1,199,138
kWh
|
$14,996
-
kW-mo/yr
|
$128,632
-
MMBtu
|
$(-12,000.0) | $(-6,000.0) | $2,781 |
$8,115
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs